Two Motor City Electric Co. (MCE) subsidiaries worked as the EPC (Engineering, Procurement, and Construction) electrical contractor for two new wind farms in Ontario, Canada. Owner Brookfield Renewable Energy Partners and general contractor Mortenson Canada Corp. awarded Motor City Electric Utilities Co. (MCEU) and Mid South Contractors ULC (MSC) the contracts for the Gosfield and Comber wind farms.
Location: Kingsville, Ontario
Role: EPC Electrical Contractor
Customer: Mortenson Canada
Wind Farm Size: 51MW
Turbines: 22 Siemens 2.3MW
Underground Collection: 15 miles
Overhead Collection: 5 miles
Collector Substation: 120-34.5kV
Other Services Performed: Turnkey design, procurement, construction & commissioning of 50MW substation, overhead & underground collection, turbine grounding, wiring, conduit, SCADA.
Electrical Value: $17.1 million
Timeframe: Oct. 2009, Oct. 2010
All power produced from the Gosfield facility is sold at a fixed price to the Ontario Power Authority under a 20-year power purchase agreement (PPA).
Location: Lakeshore, Ontario
Role: EPC Electrical Contractor
Customer: Mortenson Canada
Wind Farm Size: 166MW
Turbines: 72 Siemens 2.3MW
Underground Collection: 40 miles
Overhead Collection: 60 miles
Collector Substation: 230-34.5kV
Other Services Performed: Turnkey design, procurement, construction & commissioning of 50MW substation, overhead & underground collection, turbine grounding, wiring, conduit, SCADA.
Electrical Value: $43.4 million
Timeframe: Oct. 2010, Oct. 2011
All trades required design and construction coordination with the local utility Hydro One (HONI) for the substation and overhead collection work. This project faced complex construction challenges with a frigid winter, long rainy periods with muddy conditions, extreme heat spells, and windy days. Despite the variable weather, our project teams worked hard and kept Comber on budget and schedule.